In mathematical and practical problem-solving, particularly in the context of project management and job completion, the term "man-days" is often used. A man-day is a unit of work that describes the amount of work performed by one person in one day. The concept is foundational in determining how long a project will take given the number of workers and the total amount of work required.

Step-by-Step Solution to the Given Problem

We will use the problem of determining how long it will take the remaining men to finish a job after some workers have left. Let's break down the process into manageable steps.

Step 1: Calculate Total Work in Man-Days

First, let's determine the total amount of work required to complete the job in man-days. If 25 men can complete the job in 32 days, the total work required is:

Total Work Number of Men times; Number of Days 25 men times; 32 days 800 man-days

Step 2: Calculate Work Done in 10 Days

In the first 10 days, the 25 men will perform:

Work Done Number of Men times; Number of Days 25 men times; 10 days 250 man-days

Step 3: Determine Remaining Work

Now, we subtract the work done from the total work:

Remaining Work Total Work - Work Done 800 man-days - 250 man-days 550 man-days

Step 4: Determine Remaining Men

After 10 days, 3 men leave, so the number of remaining men is:

Remaining Men Total Men - Men Left 25 men - 3 men 22 men

Step 5: Calculate Time to Complete Remaining Work

To find out how many days it will take the remaining 22 men to finish the remaining work of 550 man-days:

Time Remaining Work / Remaining Men 550 man-days / 22 men 25 days

Therefore, it will take the remaining 22 men 25 days to finish the job.

Alternative Solutions

Here are a few alternate solutions that use different methods of solving the same problem:

Solution 1

Using the formula for calculating remaining days:

K 300/9 33 1/3 days

Hence, the remaining work will take 33.33 days.

Solution 2

Using the rate concept:

Mandays 25 times; 40 1000 man-damsp;ays, 25 times; 16 400 man-damsp;ays, Remaining 600 man-damsp;ays, 600 / {25 – 10} 600/15 40 more days. Entire job was done in 1640 56 days.

Solution 3

Applying the concept of constant man-days:

20 times; 12 20 times; 615 times; x, therefore, x 8 days to complete the remaining work.

General Understanding and Application

These solutions are all based on the fundamental concept that the total work remains constant, and changes in the number of workers only affect the time taken to complete the job. The key is to understand and apply the principle of man-days effectively to solve such problems.

Whether you're a student or a professional dealing with similar problem-solving scenarios, the method of man-days can be a powerful tool in planning and scheduling work projects.

Keywords

man-days, work problem, mathematical problem solving